Проектно- -сметное дело В-4.doc

  • USD
    • RUB
    • USD
    • EUR
Affiliates: 0,1 $how to earn
i agree with "Terms for Customers"
Buy this item cheaper:
Sold: 4
Refunds: 0

Uploaded: 28.09.2013
Content: 30928205054957.doc 306,5 kB
Loyalty discount! If the amount of your purchases from the seller al_ac is more than:
100 $the discount is10%
50 $the discount is5%
20 $the discount is2%
If you want to know your discount rate, please provide your email:

Product description


Task №1. To determine the estimated cost and the estimated cost of the works for laying linoleum on the underlying basis teplozvukoizoliruyuschey thickness of 3.6 mm under the following conditions.


Terms Data in thous. (For option)
1 2 3 4 5 6 7 8 9 10
1. costs
on
materials (M)

2. The basic monthly salary (RFP)

3. The costs of operating the machinery (EM)
56.35


5.42



0.10
84.52


8.13



0.15
90.18


8.63



0.16
95.79


9.24



0.17
101.43


9.76



0.18
107.07


10.30



0.19
112.7


10.84



0.20
118.3


11.3



0.21
123.97


11.92



0.22
129.6


12.47



0.23

This task is recommended to perform on 2.2 "the estimated cost structure." It is necessary to clarify the concept of the estimated cost and the cost of construction, part of the direct costs, the procedure for calculating the value of the overhead of civil works and the procedure for determining the amount of planned savings.

Additional information

Task № 2. Determine the estimated cost of construction of an auto repair shop under the following conditions.
This task is recommended to perform on 2.2 "the estimated cost structure." It is necessary to clarify the concept of the estimated cost of installation work, the composition of the direct costs, the procedure for calculating the value of the cost of installation and the procedure for determining the value of the planned savings.


Terms Data in thous. (For option)
brick monolith team.
w / w window
(Wooden)
floors
top
finishing
Zem.rab metal.
Konstr Protection page. Konstr.
1 2 3 4 5 6 7 8 9 10
1. The cost of the materials (M)

2.Core
wages (ZPO)

3.Zatraty to operate machines and
mechanisms (EM)

4. Wages serving machines
(PAZ) 193.7



16.8




10.50



4.20 212.60



18.48




11.55



4.62 231.92



20.16




12.6



5.04 251.25



21.84




13.65



5.46 274.78



23.52




14.7



5.88 289.91



25.2




15.75



6.3 309.23



26.88




16.8



6.72 328.56



28.56




17.87



7.14 154.62



13.44




8.40



3.36 173.94



17.84




9.45



3.78

Feedback

0
Period
1 month 3 months 12 months
0 0 0
0 0 0
In order to counter copyright infringement and property rights, we ask you to immediately inform us at [email protected] the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)

This website uses cookies to provide a more effective user experience. See our Cookie policy for details.